<strike id="u8ask"></strike>
  • <ul id="u8ask"><center id="u8ask"></center></ul>
  • <samp id="u8ask"></samp>
    <strike id="u8ask"></strike>
    <samp id="u8ask"></samp>
  • 中文版 | English
     
    服務 Ignition
    服務 Wall wiper
    服務 Wood base
    服務 Winch rope
    服務 Kom rotator
    服務 Wheel packing
    服務 Drilling steel
    服務 Rotation pole
    服務 Conservation rubber
    服務 Liquid-gas separator
    服務 Hydraulic winch
    服務 Vacuum degasser
    服務 Blowout preventer
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/3/31 
      Wo Hing Petroleum ... 2011/3/31 
    Name: Langfang HeXing Petroeum Equipment
    Add: in the eastern ring road oil base village
    Tel: 15810047588
    Fax: 0317---2558811
    Mail: hx060718@yahoo.cn
    Product: staff@hexing.net.cn
    Location: Home >> Message details
      Wood base

       點擊圖片放大 

       詳細介紹
    Ⅰ Rig mat type
            
    Ⅱ Rig mat using
    Rig mat is mainly used for the equipment foundations of different drilling sites, such as derrick substructure, mud hog, purification can, engine house, tank car, jug, etc. It is convenient to install and has long performance life.
     
    Ⅲ Rig mat structure
    Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it. After the antiseptic treatment, the woods are clamped by M39 extended bolts.
    Ⅳ Main parameter list
     Rig mat parameter list
    Specification
    Length /mm
    Width /mm
    Thickness /mm
    Weight/Ib
    HGM8′×40′×6″
    12192
    2438.4
    160
    11973
    HGM8′×30′×6″
    9144
    2438.4
    160
    9043
    HGM8′×25′×6″
    7620
    2438.4
    160
    7604
    HGM8′×15′×6″
    4572
    2438.4
    160
    4273
     
    Ⅴ Method of application
    Rig mat can be used in any earth surface, especially in the weak formation. For the broad contact areas between rig mat and ground, it can be set on the ground directly if fulfilled the qualifications as below:
    Bearing pressure on foundation≥0.06Mpa
    Ground flatness≤40mm
     
    Ⅵ Rig mat advantages
        Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it after the antiseptic treatment. It is able to bear pressure and convenient to carry.
       
    Ⅶ Notice
    1、            Use only certified lifting devices when moving in case of accidents.
    2、  Clean the oil stains of surface every week.
    3、  Inspect the surface of rig mat, in case of odds and ends affect the stationarity of equipment.
    Add to Favorites| Home |Contact
    All rights reserved:Langfang HeXing Petroeum Equipment Add:in the eastern ring road oil base village
    Tel:15810047588 Fax:0317---2558811
    Technical Support:Hao Lian Wang Luo
    主站蜘蛛池模板: 一区二区三区国产精品| 久久精品青青大伊人av| 精品国产亚洲一区二区三区在线观看| 国产极品美女到高潮| 91九色在线播放| 天天做人人爱夜夜爽2020毛片 | 老师开嫩苞在线观看| 国产在视频线精品视频| yy6080一级毛片高清| 国产精品自在线拍国产手青青机版| gav男人天堂| 好吊色青青青国产在线播放| 中文字幕一区二区日产乱码| 日本xxxx18护士| 久久免费视频一区| 日韩电影免费在线观看网站| 亚洲va中文字幕| 欧美丝袜一区二区三区| 亚洲小说区图片区另类春色| 法国性经典xxxxhd| 人人妻人人澡人人爽欧美一区九九| 精品久久久久久中文| 午夜视频www| 网址大全在线免费观看| 性猛交xxxxx按摩中国| 久久一本岛在免费线观看2020| 日韩a无v码在线播放| 久久精品国产2020观看福利| 最新亚洲春色av无码专区| 亚洲av无码国产精品色| 波霸在线精品视频免费观看| 在公交车上弄到高c了漫画| sao货水真多好浪好紧视频| 小宝极品内射国产在线| 一边摸边吃奶边做爽动态| 成人毛片无码一区二区三区| 中文字幕在线亚洲精品| 无翼乌邪恶工番口番邪恶| 久久久久亚洲AV成人网人人网站 | 免费观看的毛片| 精品爆乳一区二区三区无码AV |